Short Lead Time for Fully-Automatic Vision Measuring Systems With Probe - Horizontal instant vision measuring machine – Handing

Short Description:


Product Detail

Product Tags

Related Video

Feedback (2)

We not only will try our great to offer superb companies to just about every buyer, but also are ready to receive any suggestion offered by our shoppers for Optical Position Encoder, Manual PPG, video mearuing instrument, Our group members are goal to provides merchandise with significant performance cost ratio to our consumers, as well as target for all of us is usually to satisfy our consumers from all around the environment.
Short Lead Time for Fully-Automatic Vision Measuring Systems With Probe - Horizontal instant vision measuring machine – Handing Detail:

Model

HD-100H

CCD 20 Million pixel industrial camera
Lens Ultra-clear bi-telecentric lens
Light source system Telecentric parallel contour light and ring-shaped surface light.
Z-axis movement mode

3KG

Load-bearing capacity

Φ100mm(The measurable range is 100×75mm)

Visual field

±2μm

Repeatability accuracy

±5μm

Measurement accuracy

IVM-2.0

Measurement software It can measure single or multiple products at the same time
Measurement mode

1-3S/100pieces

Measurement speed

AC220V/50Hz,300W

Power supply

Temperature: 22℃±3℃  Humidity: 50~70%

Vibration: <0.002mm/s, <15Hz

Operating environment

35KG

Weight

12months

How long does your normal product delivery time take?

Assembly time: Linear encoders are in stock, 3 days for manual machines, 5 days for automatic machines, 25-30 days for large stroke machines.

Are your products traceable? If so, how is it implemented?

Each of our equipment has the following information when it leaves the factory: production number, production date, inspector and other traceability information.

What is your production process?

Receiving orders – purchasing materials – full inspection of incoming materials – mechanical assembly – performance testing – shipping.

What is the average lead time?

For samples, the lead time is about 7 days. For mass production, the lead time is 20-30 days after receiving the deposit payment. The lead times become effective when (1) we have received your deposit, and (2) we have your final approval for your products. If our lead times do not work with your deadline, please go over your requirements with your sale. In all cases we will try to accommodate your needs. In most cases we are able to do so.

What is the product warranty?

We warranty our materials and workmanship. Our commitment is to your satisfaction with our products. In warranty or not, it is the culture of our company to address and resolve all customer issues to everyone’s satisfaction.


Product detail pictures:

Short Lead Time for Fully-Automatic Vision Measuring Systems With Probe - Horizontal instant vision measuring machine – Handing detail pictures

Short Lead Time for Fully-Automatic Vision Measuring Systems With Probe - Horizontal instant vision measuring machine – Handing detail pictures

Short Lead Time for Fully-Automatic Vision Measuring Systems With Probe - Horizontal instant vision measuring machine – Handing detail pictures


Related Product Guide:

Our progress depends about the advanced products ,fantastic talents and continuously strengthened technology forces for Short Lead Time for Fully-Automatic Vision Measuring Systems With Probe - Horizontal instant vision measuring machine – Handing , The product will supply to all over the world, such as: Islamabad, Detroit, Lebanon, With the goal of zero defect. To care for the environment, and social returns, care employee social responsibility as own duty. We welcome friends from all over the world to visit and guide us so that we can achieve the win-win goal together.
  • The supplier abide the theory of quality the basic, trust the first and management the advanced so that they can ensure a reliable product quality and stable customers.
    5 Stars By Jason from Malta - 2018.05.22 12:13
    Factory equipment is advanced in the industry and the product is fine workmanship, moreover the price is very cheap, value for money!
    5 Stars By Delia from Bangladesh - 2018.07.26 16:51
    Write your message here and send it to us