Chinese Professional CNC Vision Measuring Machine - Horizontal instant vision measuring machine – Handing

Short Description:


Product Detail

Product Tags

Related Video

Feedback (2)

That has a positive and progressive attitude to customer's interest, our organization consistently improves our products quality to satisfy the demands of shoppers and further focuses on safety, reliability, environmental specifications, and innovation of optical measuring system, Rotary Encoder Hollow Shaft, Automatic video measuring machine, Welcoming interested companies to cooperate with us, we look forward to having the opportunity of working with companies around the world for joint growth and mutual success.
Chinese Professional CNC Vision Measuring Machine - Horizontal instant vision measuring machine – Handing Detail:

Model

HD-100H

CCD 20 Million pixel industrial camera
Lens Ultra-clear bi-telecentric lens
Light source system Telecentric parallel contour light and ring-shaped surface light.
Z-axis movement mode

3KG

Load-bearing capacity

Φ100mm(The measurable range is 100×75mm)

Visual field

±2μm

Repeatability accuracy

±5μm

Measurement accuracy

IVM-2.0

Measurement software It can measure single or multiple products at the same time
Measurement mode

1-3S/100pieces

Measurement speed

AC220V/50Hz,300W

Power supply

Temperature: 22℃±3℃  Humidity: 50~70%

Vibration: <0.002mm/s, <15Hz

Operating environment

35KG

Weight

12months

How long does your normal product delivery time take?

Assembly time: Linear encoders are in stock, 3 days for manual machines, 5 days for automatic machines, 25-30 days for large stroke machines.

Are your products traceable? If so, how is it implemented?

Each of our equipment has the following information when it leaves the factory: production number, production date, inspector and other traceability information.

What is your production process?

Receiving orders – purchasing materials – full inspection of incoming materials – mechanical assembly – performance testing – shipping.

What is the average lead time?

For samples, the lead time is about 7 days. For mass production, the lead time is 20-30 days after receiving the deposit payment. The lead times become effective when (1) we have received your deposit, and (2) we have your final approval for your products. If our lead times do not work with your deadline, please go over your requirements with your sale. In all cases we will try to accommodate your needs. In most cases we are able to do so.

What is the product warranty?

We warranty our materials and workmanship. Our commitment is to your satisfaction with our products. In warranty or not, it is the culture of our company to address and resolve all customer issues to everyone’s satisfaction.


Product detail pictures:

Chinese Professional CNC Vision Measuring Machine - Horizontal instant vision measuring machine – Handing detail pictures

Chinese Professional CNC Vision Measuring Machine - Horizontal instant vision measuring machine – Handing detail pictures

Chinese Professional CNC Vision Measuring Machine - Horizontal instant vision measuring machine – Handing detail pictures


Related Product Guide:

Our business sticks for the basic principle of Quality could be the life with the firm, and track record will be the soul of it for Chinese Professional CNC Vision Measuring Machine - Horizontal instant vision measuring machine – Handing , The product will supply to all over the world, such as: Haiti, Bangkok, Paris, For many years, we have adhered to the principle of customer oriented, quality based, excellence pursuing, mutual benefit sharing. We hope, with great sincerity and good will, to have the honor to help with your further market.
  • Product quality is good, quality assurance system is complete, every link can inquire and solve the problem timely!
    5 Stars By Dinah from Rotterdam - 2017.11.11 11:41
    The customer service staff's answer is very meticulous, important is that the product quality is very good, and packaged carefully, shipped quickly!
    5 Stars By Sabina from Jeddah - 2017.04.08 14:55
    Write your message here and send it to us